|
november 2003 duration: 3 months
complete reforming job, rewiring, water connection, gas connection, painting, bathroom (tiling in second phase), kitchen. complete new water connection, new sanitaries except for bathtub that stayed in the original vertical position. new tiles and integrated ceiling lights. |
|||||||
| before | planning | materials | cost | inbetween | done | ||
![]()
|
|
![]() ![]() ![]() ![]() ![]()
|
|||||