november 2003 duration: 3 months
complete reforming job, rewiring, water connection, gas connection, painting, bathroom (tiling in second phase), kitchen. in the end there was no new kitchen. the old units were used with new doors made to size for the odd measurements and angles of the mini kitchen. |
|||||||
| before | planning | materials | cost | inbetween | done | ||
![]() ![]()
|
|
|
|
||||