april 2005 duration: 7 days
design and work exclusively by works XL. reforming in 4 stages: first the floor, then electrics, then painting, then the new kitchen. rewiring maintaining the basic structure to the main fuse downstairs, replacing all switches and plugs from brown old to white modern ones. total cost (not including design work) 10.841,10 euros |
|||||||