Sant Crispí:         electrics         floor         painting         kitchen

january 2005 duration: 15 days

design and work exclusively by works XL. reforming in 4 stages: first the floor, then electrics, then painting, then the new kitchen.
the apartment is used for summer rentals so a brighter design then one would use at home.

diagonal tiling makes the fairly small rooms look wider. tiled on top of the old granite floor which was still in good conditon, just very ugly.

total cost (not including design work) 10.841,10 euros

  before planning materials cost inbetween done  