march 2006 duration: 10 days
design and work exclusively by works XL. reforming in 4 stages: first the floor, then electrics, then painting, then the new kitchen. take out old kitchen, move stove to make room for fridge freezer. tiling, transport and mounting of furniture as well as all electrical items. total cost (not including design work) 10.841,10 euros |
|||||||
| before | planning | materials | cost | inbetween | done | ||
![]() ![]() ![]()
|
|
![]() ![]() ![]()
|
|||||